Recent content by Prabhupada Sahoo

  1. Prabhupada Sahoo

    Corrsion & Rust Protection

    How to protect Corrsion & Rust from of HYSD Bar
  2. Prabhupada Sahoo

    we construct a clear water reservoir (CWR) ,in the cwr main wall hunch is provided, in hunch can we provided horizontal bar for support

    Please clear my douts we construct a clear water reservoir (CWR) ,in the cwr main wall hunch is provided, in hunch can we provided horizontal bar for support
  3. Prabhupada Sahoo

    Which dia of needle used for compaction of different types of structure

    Dear Sir, Which dia of needle used for compaction of different types of structure like slab, beam column ,raft foundation and Rcc retaining wall.
  4. Prabhupada Sahoo

    Structural Design of Isolated Footing - Design Excel Sheet

    Dear Sir, Please describe the design
  5. Prabhupada Sahoo

    Reinforcement Steel Tying & General Drawings

    DEar Sir, I can't find the attachment
  6. Prabhupada Sahoo

    This is central shaft reinforcement drawing. The placement of Vertical reinforcement and horizontal reinforcement is correct position ? yes or no

    This is central shaft reinforcement drawing. The placement of Vertical reinforcement and horizontal reinforcement is correct position ? yes or no
  7. Prabhupada Sahoo

    why we use binding wire for binding main and distribution bar and which gauged of binding wire is allowed for binding the raft?

    why we use binding wire for binding main and distribution bar and which gauged of binding wire is allowed for binding the raft?
  8. Prabhupada Sahoo

    In raft foundation development length is provided or not

    In raft foundation development length is provided or not
  9. Prabhupada Sahoo

    For seepage arrested in Elevated Reservoir tank bottom dome how much quantity add mixer used for M30 grade Concrete

    Dear Sir, I am supervise the Construction of Elevated Storage Reservoir , Now the bottom dome of reservoir is underc Construction. for arrest the seepage of water from bottom dome what kind of add mixer is added and their quantity for M30 grade concrete.
  10. Prabhupada Sahoo

    Starter height and ratio

    Starter height and ratio
  11. Prabhupada Sahoo

    How to Prepare Bar Bending Schedule and its Usage with Excel sheet

    Sir very good format , I have a query Bar Bending Schedule 45o90o180o 0.250.51 what is the meaning of above bend and their value