    Can we remove the ply from bottom of slab within 3-4 days after casting of slab?

    No , the minimum time of removal of shuttering from the slab is 14 days
  2. ANSHUL24

    Unit weight of steel bar kg/mtr

    It is calculated by using the formula D*D/162 D= dia of bar in mm