Recent content by anuj@89

  1. anuj@89

    can we decrease pile cut off level?

    if Pile Cut off level is 2 mtr. can we decrease on 01 Mtr. what factors work on it?
  2. anuj@89

    if Variation is more than 15% then cube sample was failed?

    ok, but i have only one sample, if we discarded this sample then what should we do to confirm actual strength without going any additional test. like NDT or Core cutting Procedure.is there any other way to confirm.
  3. anuj@89

    NDT test (Rebound hammer Test)

    if concrete cubes fail, we don't want to go with core cutting procedure,can we proceed to Rebound test? is it acceptable or not. because as per standard this test result is not accurate, it have 25% variation.
  4. anuj@89

    if Variation is more than 15% then cube sample was failed?

    if we casted only one sample of concrete mix for testing of compressive strength, but indivisual cube results variation is more 15%.
  5. anuj@89

    Want Resignation Letter format for Civil Engineer

    Dear Tushar, u can follow this resignation letter sample.