Recent content by ARN

  1. A

    How to Calculate Rate of Loading for Concrete Cube Testing in Compression Testing Machine

    Nice elaborated, this is what the application of engineering and engineer need to check. Good going.
  2. A

    why we place steel girders over railway track in bridge rather than rcc beams?

    Generally bridge is constructed to connect two ends of valley or river or sea to access the train, buses and other vehicles. And another term is called flyover (it is also type of bridge) is constructed on highway to regulate the vehicles traffic on particular rout without disturbing the...
  3. A

    How to Prevent Rusting Of Reinforcement to continue next pour ?

    This is really appreciated you to raised the concern and thoughts come in mind to stop the rusting within the span of two subsequent pour. Let me first clear is that the the period between the first pour to second pour is too short and in worst condition it may be prolonged to 20 days up to...
  4. A

    WHY MANHOLES ARE IN ONLY CIRCULAR SHAPE..?

    In Infra works utility services like storm water line/ sewage line / MEP services lines are running. And for maintenance purpose of such lines, at some intervals the chambers / manholes are constructed. Specially for sewage and storm water lines, with increasing the slope and length of line...
  5. A

    How to achieve growth in career in engineering

    MSP and Primavera software are the some planning oriented tools which are generally used in construction management for mega projects/ fast track projects or any kind of projects where Time factor is having prime importance respective to Quality, Safety and Cost. If any body want to switch over...
  6. A

    People on this forum are really great!!

    People on this forum are really great!!