Recent content by Bakiya

  1. B

    I am working Quality Engineer in Ready Mix Concrete .I faced lot of troubles using flyash in concrete. bottom of the slab is leaked i used only 18%

    Anybody help me this issue. my M20 grade design is Cement -260kg, Ash-60kg, 20mm-710kg,12.5mm-490kg,M.Sand-840kg,Water-140kg,Admixture-1.3kg Fossroc - Auromix 200