Hello i am a studied construction manager with second class upper degree from Makerere university-Uganda.
I have special experience in structural designs and quantity surveying works and construction site management. I have trained with several companies on multistory buildings and villas.
Any...
I am looking for a scholarship /sponsorship to enable me upgrade in construction project management. Anyone with a link please contact me via..
botyogeorgea@gmail.com
Before excavation.
Determine the OGL reduce level. After excavation to required level you determine the new reduced level.
The difference is the height/depth of excavation . Determine the bulk density of the sample of excavated material and multiple it with the volume of trench.
Density x Lxwxd
The following can also be provided via the pre-construction process.
Procurement plan
Execution plan
Project scope
Engineering
Evaluations as specified by client
Basis of design
Integrated Project Schedule
Risk analysis
Utility requirements
Cash curve
Constructability review
Equipment list...
This site uses cookies to help personalise content, tailor your experience and to keep you logged in if you register.
By continuing to use this site, you are consenting to our use of cookies.