Recent content by Chandan

  1. C

    Excel Construction Project Dashboard Sample for Planning Engineers

    Dear Sir, Please provide excel sheet.
  2. C

    Regarding payment for carriage of excavated material

    If I excavate a area 10x10x10m total volume of excavated soil will be 1000cum.For carriage of excavated soil ,client will pay for 1000cum or 30% more than 1000cum(1300cum). As per my opinion, due to swelling, volume of compacted soil will be increased after excavation, more than-20-30% . Please...
  3. C

    Regarding Measurement of shoring Quantity

    Dear Sir, Which Code is used for measurement of shoring work.
  4. C

    Regarding Waist slab thickness

    As per drawing waist slab thickness is 150mm due to error waist slab thickness is 135mm how to increase the thickness of waist slab . please provide the solution.
  5. C

    What is the stranded working space during excavation in different types of material

    As per is code-1200, working space is 600mm .But As per cpwd it is depend on depth, for more than 1.5meter height Maximum-750mm working space is taken .For water tank and other structure working space is mentation in drawing.
  6. C

    How to maintain all laps staggered & not more than 50% bars to be

    50% Steel cut length of steel is 4.350mm(3.050+50*25),50% length is 7.350. so that 50% Bar is Lapped in One floor
  7. C

    Dear Sir, What is the density of SS 304.

    Dear Sir, What is the density of SS 304.
  8. C

    Rate analysis for construction

    You can find find labour constant & other Constant from this file.
  9. C

    Dear Sir, Please provide the material consumption per square meter for building...

    Dear Sir, Please provide the material consumption per square meter for building construction.All civil item that used in building construction.
  10. C

    Dear Sir, I want to need formate for Client Final bill prepare. please provide.

    Dear Sir, I want to need formate for Client Final bill prepare. please provide.