If I excavate a area 10x10x10m total volume of excavated soil will be 1000cum.For carriage of excavated soil ,client will pay for 1000cum or 30% more than 1000cum(1300cum).
As per my opinion, due to swelling, volume of compacted soil will be increased after excavation, more than-20-30% .
Please...
As per drawing waist slab thickness is 150mm due to error waist slab thickness is 135mm how to increase the thickness of waist slab .
please provide the solution.
As per is code-1200, working space is 600mm .But As per cpwd it is depend on depth, for more than 1.5meter height Maximum-750mm working space is taken .For water tank and other structure working space is mentation in drawing.