  1. C

    Excel Construction Project Dashboard Sample for Planning Engineers

    Dear Sir, Please provide excel sheet.
  2. C

    Regarding payment for carriage of excavated material

    If I excavate a area 10x10x10m total volume of excavated soil will be 1000cum.For carriage of excavated soil ,client will pay for 1000cum or 30% more than 1000cum(1300cum). As per my opinion, due to swelling, volume of compacted soil will be increased after excavation, more than-20-30% . Please...
  3. C

    Regarding Measurement of shoring Quantity

    Dear Sir, Which Code is used for measurement of shoring work.
  4. C

    Regarding Waist slab thickness

    As per drawing waist slab thickness is 150mm due to error waist slab thickness is 135mm how to increase the thickness of waist slab . please provide the solution.
  5. C

    What is the stranded working space during excavation in different types of material

    As per is code-1200, working space is 600mm .But As per cpwd it is depend on depth, for more than 1.5meter height Maximum-750mm working space is taken .For water tank and other structure working space is mentation in drawing.
  6. C

    How to maintain all laps staggered & not more than 50% bars to be

    50% Steel cut length of steel is 4.350mm(3.050+50*25),50% length is 7.350. so that 50% Bar is Lapped in One floor
  7. C

    Rate analysis for construction

    You can find find labour constant & other Constant from this file.