Dear Sirs,
which direction the main and distribution bar is placed in the Raft/Mat foundation & footing, means how do we lay the bars depending upon the size (Shorter span & longer span).i.e length & breadth??
Dear all Respected Senior/Junior,
How to do physical Load Test on structural member(Slab), when the strength of the test specimen fall below the required strength and is not acceptable as per 'Acceptance Criteria' of IS 456, even strength fall below after Rebound Hammer Test result.
Thanks.
Dear all Senior/Junior
As per IS Code-456 maximum free fall of concrete not more than 1.5M, but as I have seen and also using pouring farma at site 2.4M Height. Please give your feedback.
Thanks