Recent content by Gowtham Kayala

  1. Gowtham Kayala

    Why We measure concrete in m³ and asphalt in metric tons ?

    Can anyone tell me
  2. Gowtham Kayala

    Bar bending schedule for head wall in pipe culvert

    HockeyPuck I think it is because of the region I'm not getting access to this website I even used vpn, proxy but none of them are helpful So can you please send me the file contains the drainage details instead of website link It would be helpful and I wouldn't have asked if it is not important.
  3. Gowtham Kayala

    Bar bending schedule for head wall in pipe culvert

    Sir, This link also not working please check once.
  4. Gowtham Kayala

    Bar bending schedule for head wall in pipe culvert

    HockeyPuck, Sir pls check the link you sent it is not working Showing error whenever I am trying to open
  5. Gowtham Kayala

    Bar bending schedule for head wall in pipe culvert

    Sir, I don't understand what you replied but what I'm saying is that if we just remove the pipe portion from the head wall with no reference to location doesn't it gonna affect the numbers and as well as spacing of the bars And also converting back to weight is not solve the varying length...
  6. Gowtham Kayala

    Bar bending schedule for head wall in pipe culvert

    I want to estimate the Steel quantity required for head wall in a pipe culvert but I I was facing difficulty when it comes to the pipe portion at where varying length of Steel will have to be prepared and I want to find out length in the portion Please find attached file for your reference
  7. Gowtham Kayala

    Head wall QS

    How to deduct steel quantity while doing BBS for head wall in pipe culvert Please guide me
  8. Gowtham Kayala

    How to determine the frequency of the vibrator so that the required compaction of concrete can be achieved

    How to determine the frequency of the vibrator so that the required compaction of concrete can be achieved
  9. Gowtham Kayala

    How can I get a office job in Contracts Management?

    As far as I know you can a office job only by having any billing experience or being in quality also some time gets you office job by luck but for site executioner it will be only possible by MBA Anyway this is my opinion
  10. Gowtham Kayala

    Can someone tell me how to make excel sheet for Thermoplastic Road Marking

    Sir I want chainages starting and ending, length, type of line, side, in case of centre line spacing and a formulated cell which can calculate the area based on the data and also strip chart total work done on Daily basis monthly basis cumulative and mater consumed required Wastage area can be done