How to design Bolted connection for Monoroof truss placed on concrete column? Any specific method or reference for design of such type of steel column connection, please share it.
(D) Strip
Raft is provided when the load are high with B.C. of soil is low and differential settlement possibility have.
Strap footing is the footing which consists of two columns footing connected with beam.
Strip footing is provided when no of columns are in single row and their individual...
(B) Over reinforced section.
Because failure of concrete is sudden so that is not allow as per design codes. Code said over reinforced section is not allow for design.
If steel and concrete both fail at the same time it is balance section.
If concrete fail first than it is over reinforced...
Hello everyone,
My name is Jimit Shah. My qualification is BE civil. I have 3 years of working experience in different types of civil work. If any one have requirement of Civil Design engineer, I want to work on this post. Contact me on this number or email for more details
09624123215...
I refer IS codes and find out wind load but I confused where and which elements design I used wind load value? That type of example I not found in any of the book .
This site uses cookies to help personalise content, tailor your experience and to keep you logged in if you register.
By continuing to use this site, you are consenting to our use of cookies.