Recent content by kranjan

  1. kranjan

    whether this can be left in as part of concrete, as disposal of such lubricant is one more issue

    whether this can be left in as part of concrete, as disposal of such lubricant is one more issue
  2. kranjan

    Excel Quality Management Templates

    Great effort and it is ever useful and memorable one those who really make use of it. Thanks for sharing such unique and innovative mechanism for tracking the concern and their closure.
  3. kranjan

    As it is semi wet state, preferred trial at factory with actual mould and machine cast...

    As it is semi wet state, preferred trial at factory with actual mould and machine cast. Ingredients are Cement, Fly ash(Optional), Crusher sand, 6MM aggregate(Optional), water, admixture and on top colour pigment (If required). We cannot surely tell the mix batch weight, unless ingredients...
  4. kranjan

    Who is responsible for durability of the concrete structure

    In my opinion, even though Durability of structure, the responsibility lies with all stake holders who associated with work viz design/Implement/end users, but in majority the durability of structure is at execution level, the reason may be plenty one among them is cover to rebar is simple, but...
  5. kranjan

    Presentation on Types of waterproofing and how to do it

    Dear Sir, Really nice and real study information it look like. would eager to see any study made on type of water proof system wise performance rate. I hv been in this construction field last 25Years where I take ownership in delivering high end quality product and outstanding quality...
  6. kranjan

    Organizing quality meeting gathering all stake holders Arranging Quality training Deploy on site...

    Organizing quality meeting gathering all stake holders Arranging Quality training Deploy on site workmen training / demo Recognising good (Quality) performer viz Quality Conscious staff / workmen etc Audits among all department function Raise concerns if any then and their Hope this will...
  7. kranjan

    Detailed Presentation on Reinforcement Steel Work with Do and Do Not

    Thanks for pooling the extensive information, thus I am sure all team member get benefitted at 360deg as it covers all sort of do's and don'ts and real time life of reinforced steel structure. This is ever memorable one for each individual of our group member. Small information to note that...
  8. kranjan

    why cement having only 3 months expiry date and what will happen to concrete if we use after expiry

    Based on lab experiment 3 months period was granted, however it is not very specific and as long as it meet the physical and chemical properties are unaffected even beyond three months the cement can be very well used as per code.
  9. kranjan

    I am Civil Engineer had 25 Years of Experience in QMS and Concrete management, worked in various...

    I am Civil Engineer had 25 Years of Experience in QMS and Concrete management, worked in various part of India and Abroad, I had been mega Project as QC Head in T2 Mumbai Airport, Dubai World Trade center interchange road, Karwar Naval Base, Qatar Stadium etc
  10. kranjan

    Can you please suggest concrete mix that can act as slurry cum concrete of grade M40, as we...

    Can you please suggest concrete mix that can act as slurry cum concrete of grade M40, as we wanted to avoid cost incurred due to slurry which is waste once concrete flow in and it will also save time majorly