Recent content by M.R.Kulasekara Perumal

  1. M

    Which Project had best Quality Construction, do vote on it.

    1000 NCR's reflect that the work culture of both Client and Agencies engaged are not professional and involves more misunderstanding Qualitywise, legal & contractually. 0 NCR's reflect that the work culture existing between Client and Agencies might be expected to be BEST/POOREST Qualitywise...
  2. M

    how to pour the concrete in heavy reinforced column?

    Yes I support that SCC(12mm and down size) along with external surface vibrator will solve the 1) Honey comb, 2) Surface finish and 3) Compaction
  3. M

    What is required to be done after 28 days if the concrete’s strength is 85%?

    Sorry for some errors in the (point nos.) of previous posting and this is correct and shall be adopted for practice 1) First and Foremost the structure should have been ensured curing properly. 2 ) As per CPWD Tech., Specfications, if it is nominal mix(1:2:4, 1:1.5:3 & 1:1:2) and concrete...
  4. M

    What is required to be done after 28 days if the concrete’s strength is 85%?

    1) First and Foremost the structure should have been ensured curing properly. 2 ) As per CPWD Tech., Specfications, if it is nominal mix(1:2:4, 1:1.5:3 & 1:1:2) and concrete specifically done with OPC , the 28 day acceptable limit is upto 70% of the compressive strength. Any thing below 70%...
  5. M

    Excel Quality Management Templates

    Thank you Dnyan Deshmukh sir for your sharing