Recent content by Sathish vip

  1. Sathish vip

    Measures taken during construction?

    Chicken mesh to be tied in the place of junction having atleast 3" towards concrete region and brickwork region. Chicken mesh are laid with the help of nails. The chicken mesh protects the plaster surface from cracks by withstanding the thermal expansion of RCC & bricks/Blocks.
  2. Sathish vip

    Wish You All A Very Happy Teachers Day

    happy teachers day sir, In a way you people are also teachers for me
  3. Sathish vip

    Concrete The shrinkage in cement concrete decreases with -

    option b). Removal of moisture content should be correct
  4. Sathish vip

    bar bending schedule for various types of columns,beams, footing etc

    I think you have uploaded most updated autocad version of the file. Can u upload 2007 version of this file? It would be helpful.
  5. Sathish vip

    The minimum number of days after which the formwork under the slabs (including props) can be stripped is -

    Depends upon the Span of Slab. Under 4.5 metre - 7 days Over 4.5 metre - 14 days
  6. Sathish vip

    Difference between weigh batching & volume batching

    Any disadvantages in Volume Batching ? Because I Follow measurement box for aggregate batching.
  7. Sathish vip

    Difference between weigh batching & volume batching

    Which method is better volume batching or weight batching?
  8. Sathish vip

    Here is Practical Explanation about Next Life, Purpose of Human Life, philosophical/religious facts,

    No religion based topics here. This is only for civil engineers
  9. Sathish vip

    Calculate the quantity of the brick work using central line method.

    i think the correct option is option 4).135, Length 8 Breadth8Height