Recent content by Shakefareeth

  1. S

    When beam depth is more then 750 then extra bar placed but its which depth we have to provide and how much bar is provided ?

    The bars are called skin bars .12diabars@200mm c/c on either side of the beam
  2. S

    Fly Ash The addition of pozzolana to cement results in:

    Initial setting time will be delayed. But strength after 180days will be equel to opc concreting. Good for under water concreting and better corrosion resistant