Recent content by shivanand Mali

  1. S

    detection of leakage

    Hi, As I am seeing in picture water stagnate on the floor, you have to give proper slope in tile, so water can flow properly toward outlet pipe so 50% problem will resolve, balance 50% fill all the tile joint properly with external epoxy grout, I fill you will do this problem can minimize.
  2. S

    PQC design & Synthetic floor checklist

    Hi, Team, I required PQC mix design & Synthetic floor checklist , if have anyone please share ,its urgent . Regards Shivanand
  3. S

    Voided slab construction Methodology

    hi, Is there cost save in this type of slab comparing the regular slab & is there any disadvantage of this slab
  4. S

    Gypsum pot life

    hi team, anybody know is there any pot life of gypsum ,or anywhere mentioned in IS code
  5. S

    Android Application for Rate Analysis

    sir i am traying to register but not happened is there any other way
  6. S

    Android Application for Rate Analysis

    Hi, is there any registration required to download this app or any anjal charges
  7. S

    Suggest a best way to fit a EWC at any upper floor with out any sunken slab.

    If you will send sketch of area where you want to fix commode. it will easy to suggest
  8. S

    Suggest a best way to fit a EWC at any upper floor with out any sunken slab.

    You can do back entry for P trap ,so you not need any upstand to hide any pipe line
  9. S

    Hello Everyone

    hi