One more property of clay brick used should be fully burnt to ensure water absorption orelese unburnt,half burnt clay bricks will crumble if in come in contact with water.
Top reinforcement of edge beam should rest on the top reinforcement of the supporting beam running perpendicular to the edge beam.In your photo the detail is contrary to my above views, hence incorrect
BOQ is the bill of quantities of various items involved in the project under different budget head. The presentation of bill of quantities summed under different budget heads becomes ABSTRACT.
1) Dimensions to be matched in both the drawings
2)Architectural features to be incorporated in structural drawings wherever required
3)column position should be coordinated with architectural drawings as their position crucial from room layout, toilet layout.
One way to find out load carrying capacity of concrete beam at site will be by loading above the beam by pre weighed bags of sand and measure the deflection of the beam which should be equal to the designed deflection.