Recent content by vishal Tade

  1. vishal Tade

    It is necessary to do waterproofing in UGT upto ceiling level(water level+free board) or upto only water level is sufficient?

    It is necessary to do waterproofing in UGT upto ceiling level(water level+free board) or upto only water level is sufficient?
  2. vishal Tade

    What is Khurra in terrace waterproofing? How it is prepared

    What is Khurra in terrace waterproofing? How it is construct at site.
  3. vishal Tade

    What is the diff between Quality Assurance and Quality Control?

    What is the diff between Quality Assurance and Quality Control?
  4. vishal Tade

    WhatsApp Group for Civil Engineering Professionals working in Quality Department

    Plz add my no xxxxxxxxxx I am working in quality department.
  5. vishal Tade

    Dear sir plz share a copy of IS 9001

    Dear sir plz share a copy of IS 9001
  6. vishal Tade

    Is the RCC bond beam(Patli) is required in solid blockwork?

    Is the RCC bond beam(Patli) is required in solid blockwork?
  7. vishal Tade

    Can we remove the ply from bottom of slab within 3-4 days after casting of slab?

    Can we remove the ply from bottom of slab within 3-4 days after casting of slab?
  8. vishal Tade

    Which shuttering oil is best for Mivan shuttering

    Which shuttering oil is best for Mivan shuttering 1) Water base 2) Oil base
  9. vishal Tade

    Curing compound is sufficient or not for slab curing?

    Sir Is the curing compound is sufficient for curing of slab?