IS 1200-5: Method of measurement of building and civil engineering works, Part 5: form work

Surya Singham

Knowledgeable Member
IS 1200-5: Method of measurement of building and civil engineering works, Part 5: form work
by Bureau of Indian Standards

Publication date 1982


Name of Standards Organization: Bureau of Indian Standards (BIS)
Division Name: Civil Engineering
Section Name: Methods of Measurement of Works of Civil Engineering (CED 44)

Designator of Legally Binding Document: IS 1200-5
Title of Legally Binding Document: Method of measurement of building and civil engineering works, Part 5: form work
Number of Amendments: 1


Download Link
Click Here
 
Page 8 Clause 6.6
Formwork to secondary beams shall be measured up to the sides of main beams, but no deduction shall be Made from the formwork of the main beam where the secondary beam intersects it. Form work to beam shall be measured up to sides of column, but no deduction shall be made from the formwork to stanchion or column casings at intersections of beam.

IS THIS APPLICABLE FOR ALUMINIUM SHUTTERING?
AND IF THEIR IS CONNECTING BEAM FOOTING TO FOOTING THEN THIS CLAUSE WILL APPLICABLE OR NOT?
 
  • Like
Reactions: Arif
IS 1200-5: Method of measurement of building and civil engineering works, Part 5: form work
by Bureau of Indian Standards

Publication date 1982


Name of Standards Organization: Bureau of Indian Standards (BIS)
Division Name: Civil Engineering
Section Name: Methods of Measurement of Works of Civil Engineering (CED 44)

Designator of Legally Binding Document: IS 1200-5
Title of Legally Binding Document: Method of measurement of building and civil engineering works, Part 5: form work
Number of Amendments: 1


Download Link
Click Here
Thanks a lot!