I have attached BOQ and cost sheet for MEP Project.
Attached excel sheet consist of following spreadsheets;
Bill of Quantity - HVAC Works
Bill of Quantity - Water Supply and Drainage Work
Bill of Quantity - Electrical Works
Bill of Quantity - Low Current Works
Bill of Quantity - Firefighting and fire alarm works
Bill of Quantity - LPG works
Estimation for Project Overheads
Cost Sheet
Summary Report
The attached BOQ sheet is made for project of ground + 19 floors, use it as a reference to make your own.
Download BOQ sheet from below attachment.
Attached excel sheet consist of following spreadsheets;
Bill of Quantity - HVAC Works
Bill of Quantity - Water Supply and Drainage Work
Bill of Quantity - Electrical Works
Bill of Quantity - Low Current Works
Bill of Quantity - Firefighting and fire alarm works
Bill of Quantity - LPG works
Estimation for Project Overheads
Cost Sheet
Summary Report
The attached BOQ sheet is made for project of ground + 19 floors, use it as a reference to make your own.
Download BOQ sheet from below attachment.