Breakup for Internal Electrifications such as wiring + Fans + Fixtures + Fittings + Main Board + Earthing services of Residential building as CPWD per Plinth Area rates is -
(a) 20 %
(b) 10 %
(c) 12.5 %
(d) 33 %.
The correct Answer Is
(c) 12.5 %
(a) 20 %
(b) 10 %
(c) 12.5 %
(d) 33 %.
The correct Answer Is
(c) 12.5 %