Checklist for Bored cast in-situ piles - Reinforcement

archdevil

Royal Member
Checklist for Bored cast in-situ piles - Reinforcement

Checklist consist of following points into it;

Reinforcement
  • Length of pile cage according to bore depth of site
  • Diameter and number of longitudinal bars as pre drawings
  • As per drawing
  • Length beyond 12m, use welded lapping
  • Min length of weld and number(150mm @ 450c/c) for lapping
  • Dia of helical bars and spacing
  • Dia of cage o/oDia of stiffner bar and spacing
  • Overlapping of stiffner (350mm)Providing circular cover blocks
  • Mainbar to stiffner - welded connections
  • Rigid tie of mainbar to helical bar at intersections

Flushing
  • Selection of tremmie pipes(individual length and dia)Length of Tremmie pipes
  • Check funnel depth inside the casing pipe
  • Gap between the trimmie and bore bottom(200 to 400mm)
  • Density of bentonite solution bore bottom(1.1 to 1.2) before concreting
  • Check concrete stopper (lid) properly fixed.Ensure funnel surface is completely wet
  • Remove slush from funnel after lid fixing
 