During post concrete observation for G.F column 2 Nos size 1100mm x 300mm ,partial i can say tip of stirrup 3 Nos got exposed.
Pls suggest better way of rectification, with IS code supporting document if any?
 

Dnyan Deshmukh

Staff member
From the durability point of view it is important to keep cover to reinforcement bars as specified on structural drawings.
You can do anti-rust coating on exposed reinforcement bars and cast a concrete to cover it.

Precaution which can be taken to avoid such issue;
Ensuring cover to reinforcement bars all time i.e. - during reinforcement works, shuttering works, concreting works and immediately after concreting.