Complete cost analysis methodology inclusive of machines rental and productivity

Complete cost analysis methodology inclusive of machines rental and productivity
How do we arrive to the conclusion that the project is running in profit or loss. for deriving this we need detailed cost analysis of each and every item inclusive of the machinery hire charge, shuttering rental/fabricating cost, manpower productivity, machine productivity etc. without doing this you cannot come to conclusion weather the project run i n profit or loss. more over this analysis is to be done properly for bidding for the project too.

The Attachment consist of Rate Analysis for Various Construction Items listed below;
Excavation
PCC
Reinforcement Steel
Dismantling of structure
Concrete
RCC
Brick work
Blockwork
Stone masonry
Plastering and Pointing
Waterproofing
Nito Bond
Iron Steel and Hand Rails
Crystalline waterproofing
Shuttering
Aluminium Window
Kota Stone
Equipments
Granite
Sadarali
IPS
Drilling Holes
Insert Plates
Roads
Machinery
Manpower
And Summary of Everything


find enclosed herewith the detailed project cost analysis which was done by us some time back. the co-efficient are defined. the rate should be altered according to the locality, today price etc. to derive the final figure.


or Download from below attachment area
Sir, could you pls share how do you calculate the consumption of labor and machine, by your experience or from a consultancy company? thanks in advance