In pre-cast concrete grout holes are designed inside these pre-cast pipes. Why

Chetan Yadav

Staff member
In pre-cast concrete jacking pipes, sometimes grout holes are designed inside these pre-cast pipes. Why?


Answer: Grout holes are present in pre-cast jacking pipes for the following reasons:
  • They serve as the locations for injection of bentonite or other lubricant. Lubricant is used for both granular soils and cohesive soils to trim down the frictional resistance. For cohesive soils, the soils cannot get onto the pipes by the presence of lubricant and the shearing plane lies within the lubricant as suggested by R. N. Craig (1983). On the other hand, for granular soils, the lubricant mixes with soils with a significantly reduced friction. With the use of lubricant, longer pipe lengths can be jacked without the use of intermediate jacking station.
  • They provide the inlet locations for subsequent grouting works after completion of pipe jacking to fill completely the void space between the pipes and surrounding soils.
  • They are used as lifting holes when placing the pre-cast jacking pipes into rails inside the jacking pits.