Material samples Approval process followed at Construction Project

Rohith Rao

Junior Member
Contract documents, and specifically the contract specifications often require the contractor or subcontractors to submit materials to be used on a building project. This is to confirm the materials meet contract requirements and the needs of the end-user. A submittal will have a cover sheet, a transmittal sheet, and catalog cuts/information on a product including color, size, material used in manufacture of it, origin of the item, and information regarding power requirements, paint colors, patterns, or other descriptions relevant to the item.
Attached are the process followed to get Approval of submitted Sample for End-user/Management.
 

Attachments

  • Sample approval process - plng dep.pdf
    252.7 KB · Views: 978