Hi , Mr. Reddy
1) Great information provided for executed project of G+14+1 Basement based on super built up area (SBA). What was the SBA for this project.
2) What was the tentative BUA in SFT, and SBA/BUA ratio.
3) On going thru the sheet RCC coeff comes to 0.045 cum/SFT(SBA) which seems to be slightly higher....it all depends on how the denominator BUA is taken.
Thanks