Hi
good evening all
please share the civil work labours rate for multi stories building (14 floors )
rate require for
reinforcement (barbending) work = -------- per ton
shuttering work per = ------------- per sqm
concreting work =------------- per cum
porotheram block work =-------per sqm
ect...........
as per 2019 market rate
good evening all
please share the civil work labours rate for multi stories building (14 floors )
rate require for
reinforcement (barbending) work = -------- per ton
shuttering work per = ------------- per sqm
concreting work =------------- per cum
porotheram block work =-------per sqm
ect...........
as per 2019 market rate