Due to cost control, our management is not accepting the variations made at site level changes of mix design.
Rate of M sand is 1.80/- per Kg, 12.5mm & 20mm CA are 8.5/- and 8/- respectively.
As per original mix design the cost is less, obiviously as per site condition, i made some changes which is not accepting by top management.
In fact, they are not try to understand to do moisture correction also.
I made a letter what is required to do to change the mix design with in IS limits.
Enclosed for some suggestion from your end.
Regards,
Vidhyasagar.
Rate of M sand is 1.80/- per Kg, 12.5mm & 20mm CA are 8.5/- and 8/- respectively.
As per original mix design the cost is less, obiviously as per site condition, i made some changes which is not accepting by top management.
In fact, they are not try to understand to do moisture correction also.
I made a letter what is required to do to change the mix design with in IS limits.
Enclosed for some suggestion from your end.
Regards,
Vidhyasagar.