I have attached, documented methodology for safe structural steel work at construction site.
This methodology is adopted at site have steps involve in demolition, Possible hazards, Risk rating, Control Measures and details of persons involved in demolition activity.
Adopting this method will ensure safe structural steel work.
Download the method statement from below attachment.
This methodology is adopted at site have steps involve in demolition, Possible hazards, Risk rating, Control Measures and details of persons involved in demolition activity.
Adopting this method will ensure safe structural steel work.
Download the method statement from below attachment.
Attachments
Last edited by a moderator: