sample of drawing control system at site

Srinivasan

Administrator
Staff member
Sep 7, 2017
812
870
mumbai
#1
as a site engineer every one receive the drawing from the various consultant for the execution purpose. unfortunately on so many sites i have notice no record has been maintained such as drg no, description, revision etc. find enclosed herewith a detailed presentation on how to maintain the drawing record along with flow chart for your knowledge please.
 

Attachments