Baseline is the value or condition against which all future measurements will be compared. The baseline is a point of reference. In project management there are three baselines – schedule baseline, cost baseline and scope baseline.

Fixed project schedule used in measuring project progress and contract performance. Any change caused by change in scope of the project invalidates the original schedule and necessitates a new baseline schedule.

n project management there are three baselines – schedule baseline, cost baseline and scope baseline. The combination of all three baselines is referred to as the performance measurement baseline. A baseline is a fixed schedule, which represents the standard that is used to measure the performance of the project.

for further details please study and refer the tutorials of m.x.p. and p6 posted on the forum
 