Minimum grade of concrete for doing RCC works varies as per the Exposure conditions.
As per IS 456, following are the minimum grade of concrete for various exposures;
Minimum Grade of Concrete for RCC | Exposure Condition |
---|
M20 | Mild |
M25 | Moderate |
M30 | Severe |
M40 | Very Severe |
M45 | Extreme |