Which of the following method is recommended by I.R.C. for design of flexible pavement -

(a) Group Index Method

(b) C.B.R Method

(c) Westegaard Method

(d) none of these.

Do reply with your answer and if possible add some description to your answer.

Once you reply, you can see the correct answer of the question, its really a fun game and learning.