Work method statements for all types of waterproofing

Work method statements for all types of waterproofing
This work procedure narrates the guidelines for carrying out Water proofing treatment for all BOQ items listed under the Contract

Work method statement includes following types of waterproofing methods in it;
1. Box Type waterproofing Horizontal 40mm Thick
2. Box Type waterproofing Vertical 30mm Thick
3. Brick Bat Waterproofing 150mm Thick
4. Waterproofing treatment for sunk floor 125mm thick
5. Waterproof Plaster on wall 12mm thick
6. Waterproofing on Terrace 150mm thick

Work Method statement for above stated waterproofing is attached below.
 

Attachments

  • Like
Reactions: Nithyanandam