Sir, I want to enhance my knowledge technically strong in civil engineering. presently working as a Site engineer past 2years if you could suggest some valuable guidelines so that I can have a good career in future waiting desperately for your reply
Hi,
I am Balaji having 10yrs of experience in various civil engineering activities piling, residential and power plant structures in execution and QA/QC.
What is wet concrete ananlysis.
samadmsin
samadmsin
1. Wet density analysis
2. Concrete yield analysis
3. Finding out cement content
4. Wet Aggregate gradation Analysis
5. Concrete bleeding analysis
5. Initial and final setting time analysis
Etc...
I want Comparative analysis of reinforcing steel bars from collapsed building and the market.
Quick question! When you cast a concrete slab for a building, and take samples out for compressive stress test, when the test comes back as a fail after the curing process, say after 28 days, what should happen to the already cast floor?
M
MadeWun
And when the cut cutter test fails too?
HockeyPuck
HockeyPuck
Check your contract - Remove & replace is typically the contractual remedy for correcting non-compliant work.
Reddeppa
Reddeppa
I am a Lab Supervisor at AVS Ready Mix Concrete Plant My hope is to have more training about Concrete Quality Work and to rise to a higher level Please have mercy on me and add my number 8105515930 on WhatsApp sir
Can anybody give me AutoCad Drawings to work from home for Hand Rail Detailing, Grating/CHQD plate Layouts as Tekla detailers give these drawing for AutoCad as it is easy to draw them in AutoCad rather than in Tekla. My email ID is neeleshlimaye@yahoo.com WhatsApp No. is +919619962671.