Recent content by kulkarni

  1. kulkarni

    What is the labour cost for building a residential building in percentage?

    for residetial building works generally labour cost - 30%
  2. kulkarni

    pressure testing in kg/cmsq for pipes from ug tank to OHWT.

    what is the prressure applied to pipe from under ground tank to OHWT for leakage testing.
  3. kulkarni

    What is tolerance limit for column verticality in multi storeyd building ?

    upto 20mm. if its more plaster will get cracks and we hae use chicken mesh and to be done in 3layers
  4. kulkarni

    capacity of flush tank for commode and urinal and release of water per liter/minute for each

    what is the capacity of flush tank for commode and release of water per liter/minute.
  5. kulkarni

    fittings required to fix wall mount commode including flush tank

    what are the fittings required required to fix wall mount commode including flush tank during construction and final fitting.
  6. kulkarni

    instrument name to check dry film thickness of paint

    what is name of instrument to check dry film thickness of paint
  7. kulkarni

    what is dry loose density of diffent types of soils, murrum, soft rock and hard rock

    what is the dry loose density of types of soils, murrum, soft rock and hard rock. using this data we can calculate volume by weighing dumper with load and empty dumper and netweight.this is useful record qtty n daily basis.
  8. kulkarni

    what is standard penetration test (SPT)

    what is standard penetration test to check soil bearing capacity. how its done.
  9. kulkarni

    electrical pump H.P calculation

    what is the calculation for Horse power for electrical pump 20 floor building
  10. kulkarni

    domestic and drinking water requirement per flat. Also for gardening and firefighting

    what i the water requirement of domestic, drinking water requirement for 1,2,3,4 bhk flats. Also water requirement for gardening and fire fighting.
  11. kulkarni

    types of loads for structural design of multistoried building

    how many types of loads are taken fr structural design of a multistoried building. what be kg/sqmt. what will be dia of bar for columns for each floor.
  12. kulkarni

    gap between internal and external painting work

    what would gap in days between internal and external painting work?
  13. kulkarni

    Finishing activities sequence

    1) chasing work for plumbing, electrical. 2) plumbing & electrical pipes fixing and finishing. 3) water proofing work in toilets, balcony and utility. 4) sewer lines fixing in toilets, balcony and utility. 5) pressure testing for plumbing in toilets and utiity. 6) door frame for main door...
  14. kulkarni

    How do you cross check the RMC plant batch report with a design mix of concrete?

    you have to weigh the transit mixer with concrete and empty mixer and note down net concrete weight. check mix design report submitted by rmc supplier for density of concrete per cum.
  15. kulkarni

    required labour work rate for multi storie building

    reinforcement work - Rs5500/MT bending, cutting machine and tower crane provided by company. ply board shuttering - Rs25/sft tower crane provided by company. Concrete by rmc - Rs 525/cum. Block work - Rs 20/sft.