Recent content by Santosh Chowdary

  1. Santosh Chowdary

    Honey Combing at column toe

    Remove loose material and coarse aggregate of it comes and apply plastering in 1:3 or of the comb is too heavy put some concrete mixed with small C.A AND MAKE RRINFORCEMENT SURVIVE
  2. Santosh Chowdary

    Why we do PCC before footings?

    PCC MEANS LEVELING COURSE MEANS ITS USED TO MAKE THE UNDULATIONS IN EARTHWORK LEVELLED AMD MAKE THE MOISTURE STOP TO ATTACK THE STEEL BARS IF ITS REINFORCED CONCRETE ABOVE IT
  3. Santosh Chowdary

    THUMB RULE FOR CALCULATING MATERIAL AND COST FOR HIGH RISE BUILDINGS

    2.5 kg per sqm of high raised building for fabrication is the best thumb rule for steel
  4. Santosh Chowdary

    pH value of construction water

    Exactly saying 6 to 8 Maintain 7 is little difficult bcuz it Haydn's only in lab environment Not acidic or not basic is good for construction
  5. Santosh Chowdary

    In Water Bound macadam roads,

    Stone dust is the answer