Recent content by Tushar sathe

  1. T

    How to convert cubic meter block work to square foot

    My work is 5000 per cum.so in per square feet what is rate block work brickwork size is 300 x 200 x 200
  2. T

    format of quotation tiles built up

    Required tiles quotation format built up rate its specification because i want to give quotation to company
  3. T

    handover procedure job

    Required when site job leave or resign and its handover to another engineer that format
  4. T

    Want Resignation Letter format for Civil Engineer

    I WANT SEND TO BOSS REQUIRED RESIGN LETEER FOR CIVIL ENGINEER
  5. T

    Cost Effective GI Lintels for replacing RCC Lintels

    What about when doing plaster get quality and bonding issue occurs or not ? plaster and that lintel
  6. T

    Important Civil Engineering Books

    ADD ME WHATSUP 9881722307