Checklist for Piling Works

Checklist for Piling Works
When we carry out any construction activity, the work should be recorded in checklist.
The Piling work checklist consist of following points;
  • Working drawing checked and approved
  • Latest revision being used
  • Surveying and setting out for location of pile done?
  • Diameter of the pile as per drg.
  • Length of the pile is as per drg.?
  • Founding level of the pile reached as per drg?
  • Verticality of the pile maintained?
  • Bar bending schedules approved?
  • Bar bending and cutting satisfactory?
  • Corrosion treatment of bars, if required, satisfactory?
  • Bar sizes and Spacing correct?
  • Bar lap lengths as per the drawing?
  • Bar assembly rigid and adequately supported (including spacers/chair supports)?
  • Cover to bottom bars, side bars, top bars correct?
  • Cover blocks approved including fixing?
  • Mix design for Pile approved? (specify Grade, Slump)
  • Theoretical concrete volume? (From founding level to cutoff level)

checklist is a important record it helps us in order to get work done correctly and it ensure we do not miss any point to check which is important from aspect of Quality of work.
Checklist attached herewith is just a sample provided for your reference, work carried out as per this procedure may have different sets of standards, material specifications, standard operating procedures and terms and conditions for doing that work. This all parameter or some parameter may not match with one you are executing at your Project.
Kindly use it as reference document only to create Checklist. You are free to modify edit, delete add any content in it and use it as per your requirement. find enclosed herewith the detailed check list for piling
 

Attachments

  • Piling Work Checklist.doc
    62 KB · Views: 523