Stone Completed stone masonry work should be cured with water for a period of -

Dnyan Deshmukh

Staff member
Completed stone masonry work should be cured with water for a period of -

(a) one week

(b) two to three weeks

(c) three to four weeks

(d) more than a month.

The correct Answer Is
(b) two to three weeks
 
  • Like
Reactions: Sumit Civil