rameshchandrapatel Active Member Delhi Apr 2, 2018 #2 Cement: 300/bag Aggregate: 2400/brass Rubble : 1500/brass Labour :2000/brass Sand 5500/ brass You already know that : I brass = 100 Cft Desired Profit 25% Specifications : Rubble masonry Width 18″ for wall compound ht 3′ from ground level in cement mortar in ratio : ( 1:6 ) Material for 1 cum: Cement : 300*(0.45*1.52*28.8)/7= Rs.844 Sand: 5500*0.3529*6*(0.45*1.52)/7= Rs.1138 Rubble: 2400*0.3529*1.25 = Rs.1058 Labour : 2000*0.3529= Rs.706 Total: Rs.3756 Profit:Add@ 25%: Rs.937 Total: Rs.4693 Rs/cum. Or Rs.133 per Cft. PCC 1:4:8 Material for 1 cum: Cement : 300*(1.52*28.8)/13 = Rs.1010 Sand: 5500*0.3529*4*1.52/13 =Rs.908 Aggregate: 2400*0.3529*8*1.52/13 = Rs.792 Sub total: Rs. 2710 For Labour Add 40% Rs.1084 Total : Rs. 3794 Profits Add25% Rs.949 Total : Rs. 4743 per Cum Rs. 134 per Cft. Upvote 0 Downvote
Cement: 300/bag Aggregate: 2400/brass Rubble : 1500/brass Labour :2000/brass Sand 5500/ brass You already know that : I brass = 100 Cft Desired Profit 25% Specifications : Rubble masonry Width 18″ for wall compound ht 3′ from ground level in cement mortar in ratio : ( 1:6 ) Material for 1 cum: Cement : 300*(0.45*1.52*28.8)/7= Rs.844 Sand: 5500*0.3529*6*(0.45*1.52)/7= Rs.1138 Rubble: 2400*0.3529*1.25 = Rs.1058 Labour : 2000*0.3529= Rs.706 Total: Rs.3756 Profit:Add@ 25%: Rs.937 Total: Rs.4693 Rs/cum. Or Rs.133 per Cft. PCC 1:4:8 Material for 1 cum: Cement : 300*(1.52*28.8)/13 = Rs.1010 Sand: 5500*0.3529*4*1.52/13 =Rs.908 Aggregate: 2400*0.3529*8*1.52/13 = Rs.792 Sub total: Rs. 2710 For Labour Add 40% Rs.1084 Total : Rs. 3794 Profits Add25% Rs.949 Total : Rs. 4743 per Cum Rs. 134 per Cft.
Savan Kumar chavan Newbie Gulbarga Apr 2, 2018 #3 Need quantity of uncoarsed rubble stone masonry Upvote 0 Downvote