Material consumption norms for various civil works

Material consumption norms for various civil works
View attachment 2332

i have noticed in my experience quite a lot of engineers and supervisors are not aware of the material consumption norms for various civil activities. due to which the are not a position to place their requirements to the purchase departments resulting in project delay and materiel wastage's etc. in the following note i try my level best to enumerate the material consumption for various civil works for everyone knowledge.

The Following are the Quantity Of Materials Required for the Concrete Works Of Different Types all concrete consumption based on the nominal mix.

P.C.C. With Graded Stone Chips :
For 10 cu.m. Of Plane Cement Concrete Work with Graded Stone Chips

For M10 Grade :-(10 CU M)
Cement @ 1.54 cu.m or 45 Bags
Sand @ 4.62 cu.m or 133 Bags
Stone Chips @ 9.24 cu.m. or 266 Bags.

For M15 Grade :- (10 CUM )
Cement @ 2.2 cu.m or 65 Bags
Sand @ 4.4 cu.m or 127 Bags
Stone Chips @ 8.8 cu.m. or 254 Bags.

For M20 Grade :- (10 CUM)

Cement @ 2.8 cu.m or 81 Bags
Sand @ 4.2 cu.m or 121 Bags
Stone Chips @ 8.4 cu.m. or 242 Bags.

For M25 Grade :- 10 CUM)
Cement @ 3.85 cu.m or 111 Bags
Sand @ 3.85 cu.m or 111 Bags
Stone Chips @ 7.7 cu.m. or 222 Bags.

P.C.C. With Brick Ballast or Brick Chips :
For 10 cu.m. Of Plane Cement Concrete Work with Brick Ballast

For M5 Grade :- 10 CUM
Cement @ 1.00 cu.m or 29 Bags
Sand @ 5.00 cu.m or 144 Bags
Brick Ballast @ 10.00 cu.m. or 288 Bags.

For M7.5 Grade :- 10 CUM)
Cement @ 1.18 cu.m or 34 Bags
Sand @ 4.74 cu.m or 137 Bags
Brick Ballast @ 9.48 cu.m. or 273 Bags.

For M10 Grade :- 10 CUM
Cement @ 1.23 cu.m or 36 Bags
Sand @ 4.92 cu.m or 142 Bags
Brick Ballast @ 9.85 cu.m. or 284 Bags.

For M15 Grade :- 10 CUM
Cement @ 2.29 cu.m or 66 Bags
Sand @ 4.57 cu.m or 132 Bags
Brick Ballast @ 9.14 cu.m. or 264 Bags.


R.C.C. With Graded Stone Chips : 10 CUM
For 10 cu.m. Of Reinforced Cement Concrete Work with Graded Stone Chips, The Amount Of Cement, Sand, Stone Chips Required are same as that of the P.C.C.

Quantity Of Steel Required :- per cum of concrete
For Normal Slab, Chajja, Lintel = 785kg or 0.785 Ton
For Roof Slab = 1180kg or 1.18 Ton
For Stair = 1570kg or 1.57 Ton
For Column and Beams = 1960kg or 1.96 Ton

Quantity Of Binding ( Black Annealed Wire) Wire Required
For Normal Slab, Chajja, Lintel = 0.785kg
For Roof Slab = 1.18kg
For Stair = 1.57kg
For Column and Beams = 1.96kg\

Brickwork in Cement Mortar (1:6)
For 10 cu.m. Of Brickwork in Cement Mortar (1:6) The Consumption Of Materials are

With Modular Bricks
Bricks @ 5000 Nos.
Cement @ 0.504 cu.m. or 15 Bags
Sand @ 3.02cu.m. or 87 Bags

With Traditional Bricks
Bricks @ 4079 Nos.
Cement @ 0.313 cu.m. or 9 Bags
Sand @ 1.88cu.m. or 54 Bags

Brickwork in Cement Mortar (1:4)

With Modular Bricks

For 100 Sq.m.100mm thick Brickwork in Cement Mortar (1:4) The Consumption Of Materials are
Bricks @ 5000 Nos.
Cemnent @ 0.63 cu.m. or 19 Bags.
Sand @ 2.52 cu.m. or 73 Bags

With Traditional Bricks
For 100 Sq.m.127mm thick Brickwork in Cement Mortar (1:4) The Consumption Of Materials are
Bricks @ 5181 Nos.
Cement @ 0.80 cu.m. or 23 Bags.
Sand @ 3.20 cu.m. or 92 Bags

Materials Required For ASF, Plastering & Neat Cement
Here is how to become a Concrete Calculator by yourself for different types of concrete operation like concrete floor , plaster wall , ceiling plaster, cement finishing etc. works.

Artificial Stone Flooring
The Quantity of materials required for 100 Sq.m. 25mm Thick Artificial Stone Flooring 3mm Topping is
Cement @ 0.859 or 25 Bags
Sand @ 0.97 cu.m or 28 Bags
Stone Chips (6mm and Down) @ 1.94 cu.m or 56 Bags

Cement and Sand Plastering
For 100 Sq.m Of Plastering the required Quantity Of Materials are :

With Cement Mortar (1:6)
12 mm thick

Cement = 0.274 cu.m or 8 Bags
Sand = 1.64 cu.m. or 48 Bags

15 mm thick
Cement = 0.342 cu.m. or 10 Bags
Sand = 2.05 cu.m. or 59 Bags

20 mm thick
Cement = 0.456 cu.m. or 13 Bags
Sand = 2.74 cu.m. or 79 Bags

With Cement Mortar (1:4)
10 mm thick

Cement = 0.319 cu.m. or 9 Bags
Sand = 1.29 cu.m. or 37 Bags

6 mm thick
Cement = 0.192 cu.m. or 6 Bags
Sand = 0.77 cu.m. 22 Bags

Neat Cement Punning
Quantity Of Materials Required for 100 Sq.m. Of Neat Cement Punning is as follows:-

1.5mm Thick
Cement = 0.186 cu.m. or 5.5 Bags

3mm Thick
Cement = 0.375 cu.m. or 11 Bags

6mm Thick
Cement = 0.750 cu.m. or 22 Bags

Unit Conversions Used In Engineering
The following are the various important measurements which are required for the day to day work in Civil Engineering :-

Weight Of 1 Bag Of Cement = 50kg
Volume Of 1 Bag Of Cement = 0.0347 cu.m.
Weight Of 1 cu.m. Of Mild Steel = 7850kg
Weight Of Concrete 1 cu.m. Of Plain Cement Concrete = 2400kg
Weight Of Concrete 1 cu.m. Of Reinforced Cement Concrete = 2500kg

Linear Measurements
1m = 100cm
1m = 1000mm
1m = 3.28 ft.
1m = 39.37 inches.
1ft. = 0.305m
1ft. = 12 inches
1ft = 30.48cm
1ft. = 304.8mm
1 inch. = 0.0254m
1 inch. = 0.0833ft.
1 inch = 2.54cm
1 inch. = 25.4mm

Area Measurements
1 Sq.m. = 10000 Sq.cm.
1 Sq.m = 1000000 Sq.mm.
1 Sq.m. = 10.76 SFT (Sq.ft.)
1 Sq.m. = 1550 Sq.inches.
1 Sq.ft. = 0.093 Sq.m.
1 Sq.ft. = 0.007 Sq.inches
1 Sq.ft. = 0.155 Sq.cm
1 Sq.ft. = 0.0016 Sq.mm.

Volume Measurements
1 Cu.m. = 1 x 10^6 Cu.cm.
1 Cu.m. = 1 x 10^9 Cu.mm.
1 Cu.m. = 35.288 CFT ( Cu.ft.)
1 Cu.m = 61023.28 Cu.inches
1CFT = 0.028 Cu.m.
1CFT = 1728 Cu.inches
1CFT = 0.061 Cu.inches
1CFT = 0.000061 Cu.mm.
 
  • Like
Reactions: Punnaiah
Material consumption norms for various civil works
View attachment 2332

i have noticed in my experience quite a lot of engineers and supervisors are not aware of the material consumption norms for various civil activities. due to which the are not a position to place their requirements to the purchase departments resulting in project delay and materiel wastage's etc. in the following note i try my level best to enumerate the material consumption for various civil works for everyone knowledge.

The Following are the Quantity Of Materials Required for the Concrete Works Of Different Types all concrete consumption based on the nominal mix.

P.C.C. With Graded Stone Chips :
For 10 cu.m. Of Plane Cement Concrete Work with Graded Stone Chips

For M10 Grade :-(10 CU M)
Cement @ 1.54 cu.m or 45 Bags
Sand @ 4.62 cu.m or 133 Bags
Stone Chips @ 9.24 cu.m. or 266 Bags.

For M15 Grade :- (10 CUM )
Cement @ 2.2 cu.m or 65 Bags
Sand @ 4.4 cu.m or 127 Bags
Stone Chips @ 8.8 cu.m. or 254 Bags.

For M20 Grade :- (10 CUM)

Cement @ 2.8 cu.m or 81 Bags
Sand @ 4.2 cu.m or 121 Bags
Stone Chips @ 8.4 cu.m. or 242 Bags.

For M25 Grade :- 10 CUM)
Cement @ 3.85 cu.m or 111 Bags
Sand @ 3.85 cu.m or 111 Bags
Stone Chips @ 7.7 cu.m. or 222 Bags.

P.C.C. With Brick Ballast or Brick Chips :
For 10 cu.m. Of Plane Cement Concrete Work with Brick Ballast

For M5 Grade :- 10 CUM
Cement @ 1.00 cu.m or 29 Bags
Sand @ 5.00 cu.m or 144 Bags
Brick Ballast @ 10.00 cu.m. or 288 Bags.

For M7.5 Grade :- 10 CUM)
Cement @ 1.18 cu.m or 34 Bags
Sand @ 4.74 cu.m or 137 Bags
Brick Ballast @ 9.48 cu.m. or 273 Bags.

For M10 Grade :- 10 CUM
Cement @ 1.23 cu.m or 36 Bags
Sand @ 4.92 cu.m or 142 Bags
Brick Ballast @ 9.85 cu.m. or 284 Bags.

For M15 Grade :- 10 CUM
Cement @ 2.29 cu.m or 66 Bags
Sand @ 4.57 cu.m or 132 Bags
Brick Ballast @ 9.14 cu.m. or 264 Bags.


R.C.C. With Graded Stone Chips : 10 CUM
For 10 cu.m. Of Reinforced Cement Concrete Work with Graded Stone Chips, The Amount Of Cement, Sand, Stone Chips Required are same as that of the P.C.C.

Quantity Of Steel Required :- per cum of concrete
For Normal Slab, Chajja, Lintel = 785kg or 0.785 Ton
For Roof Slab = 1180kg or 1.18 Ton
For Stair = 1570kg or 1.57 Ton
For Column and Beams = 1960kg or 1.96 Ton

Quantity Of Binding ( Black Annealed Wire) Wire Required
For Normal Slab, Chajja, Lintel = 0.785kg
For Roof Slab = 1.18kg
For Stair = 1.57kg
For Column and Beams = 1.96kg\

Brickwork in Cement Mortar (1:6)
For 10 cu.m. Of Brickwork in Cement Mortar (1:6) The Consumption Of Materials are

With Modular Bricks
Bricks @ 5000 Nos.
Cement @ 0.504 cu.m. or 15 Bags
Sand @ 3.02cu.m. or 87 Bags

With Traditional Bricks
Bricks @ 4079 Nos.
Cement @ 0.313 cu.m. or 9 Bags
Sand @ 1.88cu.m. or 54 Bags

Brickwork in Cement Mortar (1:4)

With Modular Bricks

For 100 Sq.m.100mm thick Brickwork in Cement Mortar (1:4) The Consumption Of Materials are
Bricks @ 5000 Nos.
Cemnent @ 0.63 cu.m. or 19 Bags.
Sand @ 2.52 cu.m. or 73 Bags

With Traditional Bricks
For 100 Sq.m.127mm thick Brickwork in Cement Mortar (1:4) The Consumption Of Materials are
Bricks @ 5181 Nos.
Cement @ 0.80 cu.m. or 23 Bags.
Sand @ 3.20 cu.m. or 92 Bags

Materials Required For ASF, Plastering & Neat Cement
Here is how to become a Concrete Calculator by yourself for different types of concrete operation like concrete floor , plaster wall , ceiling plaster, cement finishing etc. works.

Artificial Stone Flooring
The Quantity of materials required for 100 Sq.m. 25mm Thick Artificial Stone Flooring 3mm Topping is
Cement @ 0.859 or 25 Bags
Sand @ 0.97 cu.m or 28 Bags
Stone Chips (6mm and Down) @ 1.94 cu.m or 56 Bags

Cement and Sand Plastering
For 100 Sq.m Of Plastering the required Quantity Of Materials are :

With Cement Mortar (1:6)
12 mm thick

Cement = 0.274 cu.m or 8 Bags
Sand = 1.64 cu.m. or 48 Bags

15 mm thick
Cement = 0.342 cu.m. or 10 Bags
Sand = 2.05 cu.m. or 59 Bags

20 mm thick
Cement = 0.456 cu.m. or 13 Bags
Sand = 2.74 cu.m. or 79 Bags

With Cement Mortar (1:4)
10 mm thick

Cement = 0.319 cu.m. or 9 Bags
Sand = 1.29 cu.m. or 37 Bags

6 mm thick
Cement = 0.192 cu.m. or 6 Bags
Sand = 0.77 cu.m. 22 Bags

Neat Cement Punning
Quantity Of Materials Required for 100 Sq.m. Of Neat Cement Punning is as follows:-

1.5mm Thick
Cement = 0.186 cu.m. or 5.5 Bags

3mm Thick
Cement = 0.375 cu.m. or 11 Bags

6mm Thick
Cement = 0.750 cu.m. or 22 Bags

Unit Conversions Used In Engineering
The following are the various important measurements which are required for the day to day work in Civil Engineering :-

Weight Of 1 Bag Of Cement = 50kg
Volume Of 1 Bag Of Cement = 0.0347 cu.m.
Weight Of 1 cu.m. Of Mild Steel = 7850kg
Weight Of Concrete 1 cu.m. Of Plain Cement Concrete = 2400kg
Weight Of Concrete 1 cu.m. Of Reinforced Cement Concrete = 2500kg

Linear Measurements
1m = 100cm
1m = 1000mm
1m = 3.28 ft.
1m = 39.37 inches.
1ft. = 0.305m
1ft. = 12 inches
1ft = 30.48cm
1ft. = 304.8mm
1 inch. = 0.0254m
1 inch. = 0.0833ft.
1 inch = 2.54cm
1 inch. = 25.4mm

Area PlxMeasurements
1 Sq.m. = 10000 Sq.cm.
1 Sq.m = 1000000 Sq.mm.
1 Sq.m. = 10.76 SFT (Sq.ft.)
1 Sq.m. = 1550 Sq.inches.
1 Sq.ft. = 0.093 Sq.m.
1 Sq.ft. = 0.007 Sq.inches
1 Sq.ft. = 0.155 Sq.cm
1 Sq.ft. = 0.0016 Sq.mm.

Volume Measurements
1 Cu.m. = 1 x 10^6 Cu.cm.
1 Cu.m. = 1 x 10^9 Cu.mm.
1 Cu.m. = 35.288 CFT ( Cu.ft.)
1 Cu.m = 61023.28 Cu.inches
1CFT = 0.028 Cu.m.
1CFT = 1728 Cu.inches
1CFT = 0.061 Cu.inches
1CFT = 0.000061 Cu.mm.