Most of the shrinkage in concrete takes place in -
(a) 28 days of curing
(b) 1 month of drying
(c) 6 months of drying
(d) 12 months of drying.
The correct Answer Is
(c) 6 months of drying
(a) 28 days of curing
(b) 1 month of drying
(c) 6 months of drying
(d) 12 months of drying.
The correct Answer Is
(c) 6 months of drying