Presentation on Rate Analysis For Construction Activities

Presentation on Rate Analysis For Construction Activities
In this presentation on rate analysis you will be in position to Calculation of the rate of a particular item of work from a quantities of materials and labours required and their costs
The rates of materials and labour are changing from place to place, therefore the rates of different items of work also changes from place to place so the actual figures of rates in your area need to be collected by you.

Rate Analysis Comprises of;
Cost of Materials
Cost of Labours
Tools, Plants and Sundries
Carriage
Contractors Profit

In Presentation on Rate analysis for construction Activities you will get knowledge of following;
Rates of materials and labours
Rate analysis of following items;
Excavation
Back Filling
DPC
Concrete
Plastering Work
Distemper, painting and white washing

You will get everything in detailed in presentation attached below.
 