Possible corrective actions could include:
 Adding additional trade workers or crews
 Adding or removing equipment
 Working overtime
 Bringing in additional subcontractors
 Making the job more efficient
 Eliminating factors that cause subcontractors to interfere with each other
Productivity
Let R = Production rate
Where:
T is total time, Q is the total quantity to be installed The total cost is determined by the equation: Ct = Ch  T
Where
Ct = total cost and Ch = cost per hour, or Ct = Ch  (Q/R)