Roles And Responsibilities Of The Civil Foreman or Supervisor
Check For The Construction Joint Is Done As Per Drawing Or Not
Maintaining Housekeeping At Every Floor
Making Arrangements For Concrete
After Concreting Cleaning The Pump Area
All Finishing Activity Should Be Done By Concrete Foreman / Supervisor
Monitoring The Mason & Reporting To Tower In-Charge
Check For All Water Should Be Taken Out Of The Planters Is done
Storage & Stacking Of Material Is Done As Per The Plan Given By The Incharge Or not
Date Of Concrete Of Pour Is At least Written At Four Areas
Check For Drip Moulds
Curing Of Concrete
Check For Wall Tie Hole Plugging
Check For Barrication At The Places Where It Requires
Supporting For The Concrete Pipe Line
Cleaning Of Slab Area Before Concreting Is Done Or Not
Check For The Construction Joint Is Done As Per Drawing Or Not
Maintaining Housekeeping At Every Floor
Making Arrangements For Concrete
After Concreting Cleaning The Pump Area
All Finishing Activity Should Be Done By Concrete Foreman / Supervisor
Monitoring The Mason & Reporting To Tower In-Charge
Check For All Water Should Be Taken Out Of The Planters Is done
Storage & Stacking Of Material Is Done As Per The Plan Given By The Incharge Or not
Date Of Concrete Of Pour Is At least Written At Four Areas
Check For Drip Moulds
Curing Of Concrete
Check For Wall Tie Hole Plugging
Check For Barrication At The Places Where It Requires
Supporting For The Concrete Pipe Line
Cleaning Of Slab Area Before Concreting Is Done Or Not