Safe work method statement for demolition of wall

archdevil

Royal Member
When something goes wrong completely, we need to demolish it.
I have attached, documented methodology for safe demolition of wall at construction site.
This methodology is adopted at site have steps involve in demolition, Possible hazards, Risk rating, Control Measures and details of persons involved in demolition activity.

Adopting this method will ensure safe demolition process.

Download the method statement from below attachment.
 

Attachments