Form work:-
columns & Beams deviation is = +12mm more (or) - 6mm less in size
In footing plan= + 50 mm more (or) – 12 mm less size,
In depth= + 0.05 D (specified thickness).

Reinforcement:-
For effective depth D < 200mm = + 10mm
For effective depth D > 200mm = + 15mm
For Cover to reinforcement = + 10mm
Maximum free fall of concrete = 1.50 m height.

TOLERANCE ON DIA IN LENGTH:-
0-25mm = + 0.5 %
25-35mm = + 0.6 %
35-50mm = + 0.8 %

TOLERANCE ON WEIGHT PER METRE:-
0-10mm = +7%
10-16mm = + 5%
16 and above = + 3%

TOLERANCE FOR CUTTING LENGTH :-
When the specified length is not given= + 75mm (or) – 25 mm
When the min. length is specified= + 50 mm (or) – 0 mm

GENERAL:-
  • Lapping is not allowed for the bars having diameters more than 36 mm.
  • Chair spacing maximum spacing is 1.00 m (or) 1 No per 1 Sq.m
  • For dowels rod minimum of 12 mm dia should be used.
  • Chairs minimum of 12 mm dia bars to be used.
  • Longitudinal reinforcement not less than 0.8% and more than 6% of gross C/S.
  • Minimum bars for square column is 4 No’s and 6 No’s for circular column.
  • Main bars in the slabs shall not be less than 8 mm (HYSD) or 10 mm (Plain bars) and the distributors not less than 8 mm and not more than 1/8 of slab thickness.
  • Minimum thickness of slab is 125 mm
  • Dimension tolerance for cubes + 2 mm.
  • Free fall of concrete is allowed maximum to 1.50m.
  • Lap slices not be used for bar larger than 36 mm.
  • Water absorption not more than 15 %.
  • PH value of the water should not be less than 6.
  • Compressive strength of Bricks is 3.5 N / mm2
  • In steel reinforcement binding wire required is 10 kg per MT
  • In soil filling as per IS code 100 sqm should take 3 sample for core cutting test