QA in concrete

Doing concrete mix designs
Material selections
Preparing inspection and test plan for concrete materials along with acceptance criteria.


QC in concrete
Ensuring concrete produce as per the specified mix with necessary corrections required.
Testing of materials as per set frequencies.
Doing concrete cube testing.

this is general short brief, QA part is those activity which are done to ensure concrete made is of good quality.

QC part is controlling the things and doing tests as per the plan to assure the concrete meets the requirement.

QA - Mostly Planning of Activities in all aspects.
QC - Controlling the activities as stated in QA Plan.