What is RFI and how to raise it

Sumit Civil

Well-Known Member
What is RFI and how to raise it.

In which condition RFI should be raised and how to control it.


What to do, when no response is recieved from designer.

How to control drawings when there are many answered RFI
 
RFI=Request for inspection
Its mean when your any Specific Activity is complete for inspection than you will send the RFI to your client or their designated representative direct or through the PMT.
Which the following documents
1.QMIS page
2.RFI page
3.Chacklists
4.Drawings (Related to the specific job)
5.Lab Report (IF REQUUIRED)
 

MANNU_CIVIL

Junior Member
A request for information (RFI) is a standard business process whose purpose is to collect written information about the capabilities of various suppliers[1]. Normally it follows a format that can be used for comparative purposes.
An RFI is primarily used to gather information to help make a decision on what steps to take next. RFIs are therefore seldom the final stage and are instead often used in combination with the following: request for proposal (RFP), request for tender (RFT), and request for quotation (RFQ). In addition to gathering basic information, an RFI is often used as a solicitation sent to a broad base of potential suppliers for the purpose of conditioning suppliers' minds, developing strategy, building a database, and preparing for an RFP, RFT, or RFQ.[2]
The ubiquitous availability of the Internet has made many government agencies turn either to state-run or vendor operated websites which provide listings of RFIs as well as RFPs and RFQs. Many allow vendors to sign up at no charge to receive e-mails of requests either generally or for specific categories of product or service for which there is an interest. In some cases, the entire process is conducted online and collects responses as scanned documents or PDF files uploaded to the server; in other cases, or for legal reasons, a response must be sent in hard copy form and/or on CD/DVD disc or flash drive by mai